Concrete Calculator
Cubic yards and bags for slabs, footings and columns.
Sidewalks should be at least 4 inches thick. Small slabs are usually 4 to 6 inches, depending on the load.
Covers spills, uneven ground and form bulging.
Examples: , , ,
Enter length and width to see how much concrete you need.
Short answer
Multiply length, width and thickness, all in feet, to get cubic feet. Divide by 27 for cubic yards, then add extra for waste. An 80 lb bag makes 0.60 cubic feet, so a cubic yard takes 45 bags before the extra.
On this page
How do I use the concrete calculator?
- Pick a shape: Slab for patios, walks, garage floors and footings, Round slab for a hot tub pad, or Column for piers and fence post holes.
- Enter the measurements. You can type feet and inches together:
10,10.5,10 1/2and10' 6"all mean the same length. - Keep the extra at 10%, or change it, and pick the bag size you plan to buy.
- Read the cubic yards first, then the bags or the ready-mix order. Type a price per bag to see the cost.
How is the volume worked out?
Every shape is a volume. The bags come from dividing that volume by what one bag makes. All measures are converted to the same unit first, so 4 inches counts as one third of a foot.
- SlabV = L × W × T
- Round slabV = π × (D ÷ 2)² × T
- ColumnV = π × (D ÷ 2)² × H × n
- Total with extraTotal = V × (1 + x ÷ 100)
- BagsBags = round up (Total ÷ Y)
Work in cubic feet and divide by 27 to get cubic yards. Round up means to the next whole number.
| Symbol | Meaning | Unit |
|---|---|---|
| L | Length of the slab | ft (m) |
| W | Width of the slab | ft (m) |
| T | Thickness of the slab | in (cm) |
| D | Diameter (round slab in ft, column in in) | ft or in (m or cm) |
| H | Height or depth of the column | ft (m) |
| n | Number of columns | count |
| x | Extra for waste | % |
| Y | Yield of one bag | ft³ (m³) |
Worked example
A 10 × 10 ft patio, 4 inches thick, with the default 10% extra. The bags are the total volume divided by the yield of one bag (0.60 ft³ for an 80 lb bag), rounded up.
| Shape | Slab |
|---|---|
| Length | 10' 0" |
| Width | 10' 0" |
| Thickness | 4" |
| Extra for waste | 10% |
| Bag size | 80 lb |
| Concrete needed | 1.36 yd³ |
|---|---|
| 80-lb bags | 62 |
| Ready-mix order | 1.50 yd³ |
| Without waste | 1.23 yd³ |
A common mistake
Switching a unit and keeping the number. If the thickness unit changes from inches to feet, a 4 becomes four feet, 12 times too thick. The calculator stops a thickness above 48 inches or above the smaller side of the slab, but a 4 ft thickness on a large slab still passes. When a result looks far too large, check the unit next to each number first.
How many bags of concrete do I need?
A bigger bag makes more concrete, so you buy fewer of them. The yields come from the Quikrete data sheet for Concrete Mix No. 1101. Other brands can differ, so check the label on the bag you buy.
The table below is the same 10 × 10 ft slab at four thicknesses.
| Thickness | Concrete | 80 lb | 60 lb | 50 lb | 40 lb |
|---|---|---|---|---|---|
| 3 in | 1.02 yd³ | 46 | 62 | 74 | 92 |
| 4 in | 1.36 yd³ | 62 | 82 | 98 | 123 |
| 5 in | 1.70 yd³ | 77 | 102 | 123 | 153 |
| 6 in | 2.04 yd³ | 92 | 123 | 147 | 184 |
The calculator always rounds bags up, and a few spare bags cost little.
| Bag size | Yield (ft³) | Bags per yd³ |
|---|---|---|
| 40 lb | 0.3 | 90 |
| 50 lb | 0.375 | 72 |
| 60 lb | 0.45 | 60 |
| 80 lb | 0.6 | 45 |
Do not run short mid-pour
Running short in the middle of a pour can leave a seam, which Quikrete calls a cold joint, where the new concrete meets the part that has already started to set.
How much extra should I order?
The National Ready Mixed Concrete Association (NRMCA) advises an allowance of 4 to 10 percent over the plan dimensions for waste, over-excavation and other contingencies. It says repetitive and slip-formed work allows a closer estimate, while sporadic work, such as alternating placements in slabs, footings and walls, needs a bigger allowance.
Our default is 10%, the top of that range, because a bag count that is too short costs more than a spare bag. It is a default, not a standard. Use less for a flat, tight form and more for rough ground. The field accepts 0% to 25%.
| Extra | Concrete | 80 lb bags |
|---|---|---|
| 0% | 1.23 yd³ | 56 |
| 4% | 1.28 yd³ | 58 |
| 10% | 1.36 yd³ | 62 |
Should I mix bags or order ready-mix?
Bags suit small jobs. You mix every batch yourself, so the work grows with the job. Quikrete says to allow at least 1 ft³ of mixer capacity for each 80 lb bag you mix at one time, so a wheelbarrow or a small mixer limits how fast you can pour.
Ready-mix arrives in a truck, already mixed. Suppliers set their own minimum order and delivery charges, and both vary, so call and ask before you decide. When the bag count looks like many batches of mixing, ask for a ready-mix quote.
The ready-mix line in the result is a suggestion. It rounds the total up to the nearest ¼ yd³ (0.25 m³ in metric).
How thick should a concrete slab be?
Quikrete says sidewalks should be at least 4 inches (100 mm) thick. Simple slabs for small foundations and bases are normally 4 to 6 inches (100 to 150 mm), depending on the load they carry.
For larger jobs, or where drainage is poor, Quikrete suggests digging deeper and adding several inches of gravel or crushed stone under the slab. The gravel calculator turns the area and the depth into cubic yards. This guide gives no thickness for driveways or garage floors: those depend on the vehicles and the soil, so follow your local building code and ask your supplier.
The coverage table shows how far one cubic yard goes at each thickness. It is plain arithmetic, before any extra.
| Use | Thickness |
|---|---|
| Sidewalk | at least 4 in (100 mm) |
| Small slab, base or small foundation | 4 to 6 in (100 to 150 mm) |
| Depth | 1 yd³ covers | 100 ft² takes |
|---|---|---|
| 3 in | 108 ft² | 0.93 yd³ |
| 4 in | 81 ft² | 1.23 yd³ |
| 5 in | 65 ft² | 1.54 yd³ |
| 6 in | 54 ft² | 1.85 yd³ |
Where the calculator says no
It refuses a thickness greater than the smaller side of a slab, or the diameter of a round slab, and a column wider than 48 inches. These are our own checks, set to catch a unit typed wrong. No source sets them, and they are not engineering limits.
Frequently asked questions
How many 80 lb bags make a yard of concrete?
It takes 45 bags. One cubic yard is 27 cubic feet, and an 80 lb bag yields about 0.60 cubic feet, so 27 ÷ 0.60 = 45. With 60 lb bags it takes 60 (27 ÷ 0.45), and with 40 lb bags it takes 90 (27 ÷ 0.30). Add your extra for waste on top.
How much does a yard of concrete weigh?
Normal-weight concrete weighs 140 to 150 pounds per cubic foot, according to the NRMCA. A cubic yard is 27 cubic feet, so that is 3,780 to 4,050 pounds. An NRMCA example batch measured 151 pounds per cubic foot, about 4,080 pounds per yard, so plan on roughly 3,800 to 4,100 pounds. Your supplier knows the weight of your mix.
Can I use this for a fence post?
Yes. Choose Column, then enter the hole diameter, the hole depth and the number of holes. Quikrete suggests digging a post hole about 3 times the width of the post, with a depth of one third of the post height. The result fills the whole hole, so the space the post takes up works as part of your waste margin. For anything that carries a load, follow your local building code.
Related calculators
- Gravel CalculatorCubic yards, tons and bags of gravel for a path, driveway or base.
- Square Footage CalculatorArea of a rectangle, circle, triangle or trapezoid, in square feet, yards and meters.
- Retaining Wall CalculatorBlocks, caps and gravel for a segmental retaining wall.
- Fence CalculatorPosts, panels or pickets, and rails for a fence of any length.