Skip to content
Snapline

Gravel Calculator

Cubic yards, tons and bags of gravel for a path, driveway or base.

Shape
Unit system

The right depth depends on the job. Ask your supplier or check your local code.

Covers settling, compaction and uneven ground.

Use the figure from your supplier. It changes with the material and how wet it is, so there is no default.

The volume is printed on the bag.

Examples: , ,

???Section

Enter length, width and depth to see how much gravel you need.

Short answer

Multiply the area by the depth, both in feet, to get cubic feet. Add extra for settling, then divide by 27 for cubic yards. To order by the ton, you need the weight per cubic yard from your supplier.

On this page

How do I use the gravel calculator?

  1. Pick a shape: Rectangle for a path or a pad, Circle for a fire pit base, or Known area if you already measured the space.
  2. Enter the measurements and the depth. You can type feet and inches together: 20, 20.5 and 20' 6" all work.
  3. Keep the extra at 10%, or change it.
  4. Read the cubic yards. For tons, type the weight per cubic yard your supplier gives you. For bags, type the bag size from the label.

How is the volume worked out?

Gravel is a volume: the area of the space times the depth of the layer. The depth is the finished layer, so the extra covers settling.

  • Area of a rectangleArea = L × W
  • Area of a circleArea = π × (D ÷ 2)²
  • VolumeV = Area × d
  • Total with extraTotal = V × (1 + x ÷ 100)
  • WeightWeight = Total × p
  • BagsBags = round up (Total ÷ B)

Round up means to the next whole number. Weight and bags show only when you enter p or B.

What the symbols mean
SymbolMeaningUnit
LLength of the spaceft (m)
WWidth of the spaceft (m)
DDiameter of a round spaceft (m)
dDepth of the finished layerin (cm)
xExtra for settling%
pWeight per volume, from your suppliertons/yd³ (t/m³)
BVolume of one bag, from the labelft³ (L)

Worked example

A path that is 20 feet by 10 feet, with a 3 inch layer and the default 10% extra.

You enter
ShapeRectangle
Length20' 0"
Width10' 0"
Depth3"
Extra for waste10%
You get
Gravel needed2.04 yd³
Without extra1.85 yd³

A common mistake

Ordering by the wrong measure. This calculator gives a volume, but many suppliers sell gravel by weight, and a ton is not a cubic yard. Ask how many tons make a yard of your product.

How far does a cubic yard go?

A cubic yard spreads thinner the shallower you lay it. This table is plain arithmetic: it works for any loose material, and it shows why a small change in depth changes the order so much.

Gravel coverage by depth, before any extra
Depth1 yd³ covers100 ft² takes
1 in324 ft²0.31 yd³
2 in162 ft²0.62 yd³
3 in108 ft²0.93 yd³
4 in81 ft²1.23 yd³
6 in54 ft²1.85 yd³

How do I order gravel by the ton or by the bag?

Quarries often sell gravel by the ton, while the calculator works in cubic yards. To change one into the other you need your supplier's weight per cubic yard. There is no default, because it changes with the stone and with how wet it is.

The calculator multiplies the exact volume, not the rounded number it shows. Tons from your own hand math with the rounded cubic yards can differ by a few hundredths. The table works through the path above with a weight per cubic yard we picked for the example. It is not a product figure.

Bags are the opposite: small jobs are sold in bags, and the volume of each bag is printed on it. The calculator divides your total volume by the bag volume and rounds up.

The 20 × 10 ft path, with 1.4 tons per cubic yard and 0.5 ft³ bags (example values)
StepResult
Volume the calculator shows2.04 yd³
Volume it multiplies2.037 yd³
Weight the calculator shows2.85 tons
Shown yards × 1.42.86 tons
Bags110

How deep should gravel be?

It depends on what the gravel is for. Under a concrete slab, Quikrete says that for larger jobs, or where drainage is poor, you should dig deeper and add several inches of gravel or crushed stone to the base. For a path, a pad or a drive, the right layer depends on the traffic and the soil.

This guide gives no depth for those jobs, and the calculator has no default depth. Ask your supplier and check your local building code.

Frequently asked questions

How many cubic yards of gravel do I need for 1,000 square feet?

It depends on the depth. At 3 inches deep, 1,000 square feet takes 1,000 × 0.25 ft = 250 cubic feet, which is 9.26 cubic yards before any extra. At 6 inches it takes twice that. Enter your own area and depth above to get the exact number.

Should I add extra gravel?

Yes, a little. Loose gravel packs down when it is tamped, so the layer you end up with is thinner than the one you ordered, and the ground is rarely perfectly level. We start at 10%, our default and not a standard, and you can set anything from 0% to 25%.

How do I convert cubic feet to cubic yards?

Divide by 27. A cubic yard is 3 feet by 3 feet by 3 feet, which is 27 cubic feet. So 55 cubic feet is 55 ÷ 27 = 2.04 cubic yards.